Analysis of Cost Overrun Factors and Mitigation Strategies in Residential Construction Projects Using RII Method

Authors

  • Ramkumar S Gnanamani College of Technology, Namakkal, Tamil Nadu, India Author

DOI:

https://doi.org/10.15662/IJEETR.2026.0802155

Keywords:

Cost Overrun, Residential Construction, Project Management, Cost Control, , Relative Importance Index, Construction Planning.

Abstract

Cost overrun is one of the most critical challenges faced by the construction industry, particularly in residential construction projects. It occurs when the actual project expenditure exceeds the originally estimated budget, leading to financial losses, project delays, and reduced stakeholder satisfaction.

 

The study helps project managers in improving cost control and reducing budget deviations in residential projects. This study aims to analyse the key causes of cost overruns in residential construction projects and propose effective mitigation strategies to improve cost management practices. Data were collected from construction professionals including engineers, contractors, architects, and quantity surveyors through structured questionnaires and interviews. 

A total of 46 valid responses were obtained from professionals working in various construction sectors. Statistical techniques such as Percentage Analysis and Relative Importance Index (RII) were used to evaluate and rank the major factors contributing to cost overruns. 

The results indicate that design changes during construction, inaccurate cost estimation, delays in material procurement, poor supervision, and price escalation of construction materials are the most significant factors influencing cost overruns in residential construction projects. 

The study further suggests mitigation strategies such as improved estimation practices, effective project scheduling, adoption of digital technologies like Building Information Modeling (BIM), and better coordination among project stakeholders. 

The findings of this research provide valuable insights for construction professionals and project managers in improving cost control and ensuring successful project delivery within the planned budget

References

1. Flyvbjerg B. (2002). Underestimating costs in public works projects. Journal of the American Planning Association.

2. Love P.E.D. (2005). Construction project cost overruns. Journal of Construction Engineering and Management.

3. Kaming P.F. (1997). Factors influencing construction cost overruns. Construction Management and Economics.

4. Doloi H. (2012). Understanding stakeholders’ perspectives on cost overruns. International Journal of Project Management.

5. C.Nagarajan and M.Madheswaran - ‘Stability Analysis of Series Parallel Resonant Converter with Fuzzy Logic Controller Using State Space Techniques’- Taylor &Francis, Electric Power Components and Systems, Vol.39 (8), pp.780-793, May 2011. DOI: 10.1080/15325008.2010.541746

6. C.Nagarajan and M.Madheswaran - ‘Experimental verification and stability state space analysis of CLL-T Series Parallel Resonant Converter’ - Journal of Electrical Engineering, Vol.63 (6), pp.365-372, Dec.2012. DOI: 10.2478/v10187-012-0054-2

7. C.Nagarajan and M.Madheswaran - ‘Performance Analysis of LCL-T Resonant Converter with Fuzzy/PID Using State Space Analysis’- Springer, Electrical Engineering, Vol.93 (3), pp.167-178, September 2011. DOI 10.1007/s00202-011-0203-9

8. S.Tamilselvi, R.Prakash, C.Nagarajan,“Solar System Integrated Smart Grid Utilizing Hybrid Coot-Genetic Algorithm Optimized ANN Controller” Iranian Journal Of Science And Technology-Transactions Of Electrical Engineering, DOI10.1007/s40998-025-00917-z,2025

9. S.Tamilselvi, R.Prakash, C.Nagarajan,“ Adaptive sliding mode control of multilevel grid-connected inverters using reinforcement learning for enhanced LVRT performance” Electric Power Systems Research 253 (2026) 112428, doi.org/10.1016/j.epsr.2025.112428

10. S.Thirunavukkarasu, C. Nagarajan, 2024, “Performance Investigation on OCF and SCF study in BLDC machine using FTANN Controller," Journal of Electrical Engineering And Technology, Volume 20, pages 2675–2688, (2025), doi.org/10.1007/s42835-024-02126-w

11. C. Nagarajan, M.Madheswaran and D.Ramasubramanian- ‘Development of DSP based Robust Control Method for General Resonant Converter Topologies using Transfer Function Model’- Acta Electrotechnica et Informatica Journal , Vol.13 (2), pp.18-31,April-June.2013, DOI: 10.2478/aeei-2013-0025.

12. C.Nagarajan and M.Madheswaran - ‘DSP Based Fuzzy Controller for Series Parallel Resonant converter’- Springer, Frontiers of Electrical and Electronic Engineering, Vol. 7(4), pp. 438-446, Dec.12. DOI 10.1007/s11460-012-0212-0.

13. C.Nagarajan and M.Madheswaran - ‘Experimental Study and steady state stability analysis of CLL-T Series Parallel Resonant Converter with Fuzzy controller using State Space Analysis’- Iranian Journal of Electrical & Electronic Engineering, Vol.8 (3), pp.259-267, September 2012.

14. C.Nagarajan and M.Madheswaran, “Analysis and Simulation of LCL Series Resonant Full Bridge Converter Using PWM Technique with Load Independent Operation” has been presented in ICTES’08, a IEEE / IET International Conference organized by M.G.R.University, Chennai.Vol.no.1, pp.190-195, Dec.2007

15. Suganthi Mullainathan, Ramesh Natarajan, “An SPSS and CNN modelling based quality assessment using ceramic materials and membrane filtration techniques”, Revista Materia (Rio J.) Vol. 30, 2025, DOI: https://doi.org/10.1590/1517-7076-RMAT-2024-0721

16. M Suganthi, N Ramesh, “Treatment of water using natural zeolite as membrane filter”, Journal of Environmental Protection and Ecology, Volume 23, Issue 2, pp: 520-530,2022

Downloads

Published

2026-03-28

How to Cite

Analysis of Cost Overrun Factors and Mitigation Strategies in Residential Construction Projects Using RII Method. (2026). International Journal of Engineering & Extended Technologies Research (IJEETR), 8(2), 1871-1876. https://doi.org/10.15662/IJEETR.2026.0802155